Client:
Travelodge
The eleven storey building was constructed with a reinforced concrete frame and transfer slab up to first floor level with a modular cold rolled steel frame for the ten storey hotel.
Hot rolled steel was employed in the lift shafts and stair case voids to provide the lateral wind restraint to the building and the hotel was completed on time to cater for the 2012 Olympics in Stratford, London.