Staveley Fire Station was constructed onto mass concrete foundations, with the drainage system requiring attenuation due to the site area of the development. The external areas and the fire station floor slab had to be designed to support the heavy loadings from the fire tender vehicles to avoid excessive wearing to the surface areas.
Tonight was the @CIHTEastMids annual quiz at the Canalhouse in Nottingham. HSP were delighted to sponsor this event which was at full capacity. Well done to the winners from ADC