Client
Parceline
This large industrial unit incorporated a significant number of dock levellers. Internally, within the central unit, there were numerous conveyors and internal structure which required coordinating with the steel portal frames, this was challenging to detail so as to avoid clashes.
The unit adjacent the motorway and the canal was further complicated due to the requirement of a basement running parallel to the canal.